March 2010 Work
So far this month:
-New horn installed,
-Installed the Aux Battery wiring kit, installed a 40Amp/Hr batt,
-Took out the 2 table legs and front mount as well as the metal trim under the fridge & had these pieces sandblasted and re powder-coated.
-Installed a shoulder belt on the passenger side of the bench seat and pulled out the middle belt set.
-Replaced failing right rear hatch strut with stronger one.
-Had all fuel lines replaced and gas tank "reseal" kit done.
-Oxygen Sensor replaced.
-Installed new headlight relays & rewired ground wires and installed higher powered (100W) High beams.
-voltage improved from 11.27V to 12.3v
Comments
Post a Comment