March 2010 Work

So far this month: -New horn installed, -Installed the Aux Battery wiring kit, installed a 40Amp/Hr batt, -Took out the 2 table legs and front mount as well as the metal trim under the fridge & had these pieces sandblasted and re powder-coated. -Installed a shoulder belt on the passenger side of the bench seat and pulled out the middle belt set. -Replaced failing right rear hatch strut with stronger one. -Had all fuel lines replaced and gas tank "reseal" kit done. -Oxygen Sensor replaced. -Installed new headlight relays & rewired ground wires and installed higher powered (100W) High beams. -voltage improved from 11.27V to 12.3v

Comments

Popular Posts